| Drying Performance |
Pressure dew point of a refrigerated compressed-air dryer |
Approximately +3°C under rated inlet, pressure, and ambient conditions |
Review the technical datasheet, test report, and stated rating conditions |
15% |
High |
| Airflow Capacity |
Rated flow and pressure drop through the dryer |
Capacity should exceed the actual peak demand; pressure drop should be stated at rated flow |
Compare the flow rating with the compressor output and request a performance curve |
10% |
High |
| Energy Efficiency |
Specific power consumption and operating mode |
Prefer models with energy-saving control, fan control, or variable-speed technology where the application justifies it |
Request power input data at full load and partial-load conditions; calculate annual electricity cost |
12% |
High |
| Manufacturing Quality |
Quality management system and production controls |
A valid ISO 9001 certificate covering the relevant manufacturing scope |
Check the certificate number, scope, validity, issuing certification body, and audit status |
12% |
High |
| Product Certification |
Market-specific safety and conformity documentation |
CE documentation for applicable EU requirements; additional certifications should match the destination market |
Request the Declaration of Conformity, technical file summary, risk assessment, and applicable test reports |
12% |
High |
| Pressure Equipment Compliance |
Applicability of pressure-equipment regulations |
For applicable EU installations, confirm whether the Pressure Equipment Directive 2014/68/EU applies to the pressure-bearing components |
Review the pressure rating, component certificates, conformity assessment route, and installation requirements |
8% |
Conditional |
| Refrigerant and Environmental Compliance |
Refrigerant type and environmental requirements |
Refrigerant must be legal for the destination market and supported by proper labeling and service procedures |
Request the refrigerant designation, safety data, applicable F-gas information, and service instructions |
8% |
Conditional |
| Testing and Inspection |
Factory acceptance testing and traceability |
Each unit should have a serial number, inspection record, electrical test record, and functional test evidence |
Ask for a sample inspection checklist and confirm whether pre-shipment inspection is permitted |
10% |
High |
| After-Sales Service |
Warranty, response time, spare parts, and technical support |
Written warranty terms, documented response process, parts availability, and clear escalation contacts |
Review the warranty policy, spare-parts list, service manual, remote-support process, and service-level commitments |
10% |
High |
| Lead Time and Delivery Control |
Production lead time, shipping terms, and delivery reliability |
Lead time and Incoterms should be stated in the quotation; delivery dates should be contractually documented |
Compare the quotation, production schedule, packing standard, export documents, and shipment tracking procedure |
6% |
Medium |
| Commercial Transparency |
Quotation clarity, payment terms, exclusions, and total cost of ownership |
Quotation should identify model specifications, optional items, installation requirements, taxes, freight, warranty, and service exclusions |
Use a standardized request-for-quotation form and compare five-year operating and maintenance costs |
7% |
Medium |